top of page

Preparing for 62 stations

A few months ago a customer ordered 62 AIS AO2 stations for their building in Fort Myers. The lead time for this job allowed us to perfectly prepare for the large order. The stations that was ordered is one that we feature on our website.

This is a standard 6x6x4 station, this station is a great choice for office environments with collaboration in mind. In call centers its a premium to have isolation, in collaborative workspaces its best to not wall off your employees from one another, and to encourage them to interact.

We have over 200 panels to prepare and to get ready for this job. We not only have to gather the panels, but ensure that all the components for the station are there. Surfaces, pedestal files, base plates, power recepticles, cantilievers, and connectors.

Steam cleaning the panels is standard protocol for any sale of cubicles from us. We store our panels well, but we would hate to overlook a dirty panel when installing

When panels are cleaned, and dried, we palletize them and wrap them for protection and easy movement when brought to the job site.

Stay tuned for the install at the end of March!

Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page